Represented a major water authority on harbor clean-up, which involved over 100 separate design and construction contracts, and during the peak of construction was one of the largest public works projects in the United States. The treatment plant and associated facilities provide 61 communities and 2.5 million people with state-of-the-art wastewater treatment with a capacity of over 900 million gallons per day. Construction included new primary and secondary treatment plants, a new headworks, a sludge-to-fertilizer plant, a dedicated power plant, a 5-mile inter-island tunnel and a 9.5 mile effluent outfall tunnel. As a fully integrated member of our client's management team, we have worked directly with their legal and technical staff on a day-to-day basis to avoid as many problems as possible and resolve quickly and efficiently those problems that could not be avoided. As a result of our representation, we have ten years of continuous “in-the-trenches” experience with virtually every issue that can arise during the construction of a massive tunnel/wastewater project.

Experience Center

Match our Experience to Your Needs

Experience Highlights

Calio v. Sofa Express Inc.
Represented Sofa Express Inc. in a copyright infringement case.  In response to the firm's motion to dismiss order, the court rejected the more
Real estate redevelopment venture for French Quarter Holdings Inc.
Represented French Quarter Holdings Inc. in the formation of a joint venture with Barrow Street Capital and Barclays Capital for the $120 million more
Litigation for an international design-builder of light rail transit systems
Represented an international design-builder of light rail transit systems in connection with an accident. Counseled design-builder during more
Headquarters relocation for Optimal Technologies Inc., a green technology company
Represented Optimal Technologies Inc., a technology company specializing in energy distribution network analysis and optimization technologies, in more